Peak Demand Charges
Reduce demand peaks and related electricity costs.

Commercial & Industrial Energy Storage Solution
Bluesun delivers standardized 30kW and 50kW C&I energy storage solutions, together with scalable liquid-cooled systems for larger commercial and industrial applications.
Why C&I Energy Storage
Use one coordinated system to manage energy costs, resilience and future site demand.
Reduce demand peaks and related electricity costs.
Keep essential operations running during an outage.
Store excess solar energy for later use.
Build capacity for new loads and EV charging.
A Complete C&I Energy System
Solar PV, storage, power conversion and EMS work together around your site's demand profile.
Rooftop photovoltaic modules generate on-site power.
Power conversion coordinates solar, storage and site loads.
Battery cabinets store energy for later use.
Energy management monitors and dispatches power.
The utility connection imports or exports power as configured.
A diesel generator can provide additional backup when integrated.
Selected production loads can receive priority power.
Flexible Operation
Four practical operating modes help you use energy where it creates the most value.
Discharge during high-demand periods.
Store surplus daytime generation.
Support critical loads when configured.
Coordinate available utility and generator power.
Standard C&I Solutions
Start with a clear standard configuration, then size the system to your site's actual loads.


Liquid-Cooled Energy Storage
Designed for larger commercial and industrial projects, Bluesun liquid-cooled ESS cabinets are available in 125kW / 261kWh and 417kWh configurations, delivering efficient thermal management, flexible deployment and reliable long-duration performance.
Built for bigger demands
Choose the right configuration for your site, energy profile and future expansion.
Applied C&I Scenarios
From production to charging, the right configuration starts with how your site uses power.

Support production loads and manage demand.

Coordinate rooftop solar and facility power.

Make better use of broad rooftop solar.

Support workplace and fleet charging.
Real C&I Projects
Published projects from the Bluesun CMS, with their recorded solar and storage capacities.
Frequently Asked Questions
Key questions before site assessment and system sizing.
The choice depends on measured loads, peak demand, available PV generation and the required storage duration. A site assessment confirms the configuration.
A compatible EMS and power-conversion design can coordinate storage with an existing generator. The electrical design must be checked for the site.
Yes, a suitably designed battery system may charge from the grid. The configuration depends on local rules and project goals.
Parallel operation depends on the selected hardware, electrical design and controls. Bluesun can assess the site requirements.
Backup capability requires the appropriate power conversion, switching and critical-load design.
Requirements depend on system size, site preparation, electrical connection, local permits and fire-safety rules.
Let's Build a More Efficient Business
Share your site load, solar plan and project priorities with our team.